Client: Project: Manufacturing company The Ecospan FVCOM model of the Tees was used to predict the movement and dispersion of 11 possible different chemical spills into controlled waters and the Tees estuary in support of a COMAH assessment. The CDOIF guideline was...
Client: Project: Location: Manufacturing Company Phase II contaminated land assessment as part of the due diligence required with the change of ownership to obtain baseline contamination data for the site. Drilling was undertaken to maximum depth of 10m using a...
Client Type of Work Location Chemical company Direct Toxicity Assessment (DTA) for a combined discharge to the Humber from multiple chemical manufacturers. Humber Energy generation company Direct Toxicity Assessment (DTA) of site discharge to the Tees estuary....
Client: Project: Location: Property Developer Design and execution of surveys within the dock to characterise the existing lagoon-like habitats and communities and provide baseline data on fish populations present. Reported on findings to inform the EIA...
Client: Project: Location: Harbour Authority Environmental monitoring and ecological impact assessment of sensitive habitats and species in the Salcombe-Kingsbridge Estuary. This multi-disciplinary project included modelling the sediment plumes, contaminant analysis...